Completion Date: July 2010
- Joint Venture : 72-Unit Elderly Apartment Community
- Legacy Construction was the JV General Contractor, Business Developer, Co-Estimator, Project Manager, Quality Control and Safety Manager from groundbreaking through delivery to the owner
- Contract Amount: $5,314,395
< back to project links
Project Completed: 2012
- Mentee in Mentor/Protégé Program
- $200,000,000 Barracks Renovation (17 bldgs.) – Design/Build
- 12 Miles of Underground Piping to the Central Energy Plant
- Solar Lighting
- Safety Training: Prime received One Million Man Hour Safety Award
- QA/QC Training under Mentor/Protégé
- Primavera & QCS training
- Monthly Progress, Pay Application and COE Meetings
< back to project links
Projects Completed: 2014-2016
- Replaced aged 20 Ton Liebert unit with a new unit within a secure government facility
- Pope AFB – Fire Training Rescue Plane Reconstruction
- Replaced 20 Ton HVAC unit with a 30 ton unit. GISA (SCIF)
- TI-10005-4R; 2-4953; GISA – 2 Rooftop Trane & 20 Ton Liebert
- TI-10004-5R; 2-5353; GISA – 20 Ton Liebert replacement
- Aggregate Project Amount - $713,580
< back to project links
Projects Completed: 2015
Ft. Stewart, GA
- Access Control Installation for Murray Elementary School
- New installation of Access Control with Audio Visual Monitoring
- Programmable Access Cards
- Tiered Security Access
- Secured Gate Controls
West Point, NY
- Access Control Retrofit at West Point Middle & High Schools
- Access Control with Audio Visual Monitoring Retrofit
- Programmable Access Cards
- Tiered Security Access
- Secured Gate Controls, with Remotes
- Aggregate Contract Value: $333,638
< back to project links
Projects Completed: 2015-2016
- Stanley County Water Main CLIN 1 and 2
- Stanley County Alarm System
- Repaired Liebert, and Replace 15-Ton, 5-Ton and 4-Ton units
- Chiller Repair, Liebert Repairs and AHU Replacement
- Aggregate Project Amount - $376,737
< back to project links
Projects Completed: 2015-2016
$2.6 million in aggregate, spread over 19 projects. Scope of work included:
- VAV Replacements
- DDC LON Controls, Integration and Electrical Upgrades
- Multiple CRAC Units (Liebert) for GISA
- Design/Build for Pope 737 (B-7033, H-3237 and H-3441)
- Multiple Chiller Replacements
- Rooftop AHUs
- Motor Pool Compressors, Valving and Exhaust Systems
- Multiple SCIF Environments
- Excellent Safety Record; Zero Lost Time Injuries
< back to project links
FJRP 142140 Repair Fence
8(a) IDIQ Direct Match Contracts for General Construction at Fort Bragg, NC
IDIQ Direct Match Contracts for General Construction at Fort Stewart, GA
Integrated Electronic Access Control Murray ES (Fort Stewart, GAand West Point MS (West Point, NY)
"Legacy Construction did an outstanding job with installing a 20 Ton unit. All the work was done in a professional manner. All time lines were met and the job performance throughout the time period was outstanding. They kept me abreast of everything that was taking place on a daily basis. Their overall performance during this job was exceptional."