Wells Fargo Parking Garage Bollard Cap & Concrete Installation

PROJECT:
Wells Fargo Parking Garage Bollard Cap & Concrete Installation

Project Owner:
Wells Fargo
General Contractor:
Lithko Contracting
Subcontractor(s):
Legacy Construction Inc.
J&L Excavating


Start Date:
October 26, 2024
Completion:
October 30, 2024
Contract Amount:
$68,180

Legacy Construction Inc. | Wells Fargo Parking Garage, Charlotte, NC

The Challenge: Clarifying Ambiguous Scope

The installation of security and safety bollards in a high-traffic asset like a Wells Fargo parking garage demands absolute accuracy. The primary operational challenge on this project was the ambiguity of the site plans.

The documentation vaguely labeled the placement and quantity of the hollow bollards. Any error in counting or location would have resulted in significant delays and costly rework after the concrete was poured and the bollard caps were installed. Our challenge was to transform an unclear plan into an executable, precise scope within a tight five-day window.

Our Solution: Rigorous Verification and Streamlined Logistics

Our focus was on scope validation and ensuring a seamless, coordinated effort among the trades.

Scope Verification and Risk Mitigation:
The critical solution was the implementation of a double and triple checking process. We performed exhaustive on-site measurements and cross-referencing to confirm the total number and exact locations of the hollow bollards before allowing the concrete pouring phase to commence. This rigorous verification process, though time-consuming, eliminated the risk of rework and scope creep.

Coordinated Trade Logistics:
I managed the logistical flow between J&L Excavating and the finishing crews. The $68,180 budget required extremely efficient coordination of material delivery (bollards, concrete, caps) and trade sequencing. By locking down the precise scope, we ensured that the specialized materials arrived exactly when needed, keeping the project on track for its October 30th completion.

The Result

The Wells Fargo Parking Garage Bollard Project was executed successfully, completed on time, and within the $68,180 budget. By diligently resolving the scope ambiguity through detailed, on-site verification, we mitigated potential project risk and delivered a fully accurate and compliant safety infrastructure. This project underscores our commitment to detail-oriented execution and our ability to manage critical scope verification on high-stakes commercial jobs.

Mobirise

"Our project management expertise includes detailed scope verification and risk mitigation, ensuring that vague documentation never compromises the quality or schedule of mission-critical commercial construction projects."

PREVIOUS JOBS

LEGACY Construction, Inc. | Project 1

NC Army National Guard
09/2014

FJRP 142140 Repair Fence


LEGACY Construction, Inc. | Project 2

USACE Savannah
08/2014

8(a) IDIQ Direct Match Contracts for General Construction at Fort Bragg, NC

LEGACY Construction, Inc. | Project 3

USACE Savannah
07/2014

IDIQ Direct Match Contracts for General Construction at Fort Stewart, GA

LEGACY Construction, Inc. | Project 4

DoDEA
07/2014

Integrated Electronic Access Control Murray ES (Fort Stewart, GAand West Point MS (West Point, NY)

Contacts

Khalid McRae
President/CEO
Send E-Mail
Make Phone Call 

Tracie Perry
Controller

Malik McRae
Project Manager
Send E-Mail